Print this page

Hawkes Bay Protein's Auger Installation met expectations

  • font size decrease font size increase font size
Hawkes Bay Protein's Auger Installation met expectations

Napier, 3 Nov 16 - The installation of an auger conveying system for Hawkes Bay Proteins kept a team fromNapier Engineering busy over this last Labour Weekend.

The manufacture by the NEC engineers  was not without its challenges factoring in ease of access for maintenance in the future.

Time down is a major factor and has to be kept to a minimum hence HB Protein’s client being so impressed with the short time frame for installation which resulted in minimal loss of production time for the client - that all important consideration for contract manufacturers when they look at the installation or maintenance of equipment.

A Direct from Industry News Stub with msc