MSC NewsWire

Founded by Max Farndale 1947 - 2018
  • Home
    • About Us
    • Pricing
    • Global Presswire
    • Industry Organisations
  • News Sectors
    • Headlines Through Today
    • Environmental Talk
    • Out of The Beehive
    • Primary Sector Talk
    • Reporters Desk
    • The MSC NewsReel
    • MSCNetwork
    • FinTech Talk
    • The FactoryFloor Newsreel
    • Trade Talk
    • News Talk
    • Industry Talk
    • Technology Talk
    • Blockchain
    • Highlighted
    • The TravelDesk
      • TravelMedia
      • Sporting Tours
      • Holidays Tours Events + More
      • Airfares
      • Travel Enquiry Form
      • TravelBits
    • Travel Updates
    • The MSC TravelDesk Newsreel
    • Travel Talk
    • Travel Time
    • The Bottom Line
    • Regional News
    • News to Run Advice Form
    • World News
    • NewsDIRECT
    • MSCVoxPops
    • Press Releases
  • National Press Club
  • Contact Us

Minister signs off Mine re-entry Concept Plan

  • font size decrease font size decrease font size increase font size increase font size
  • Print
  • Email

Minister Responsible for Pike River Re-entry Andrew Little has signed off the Pike River Recovery Agency’s Concept Plan outlining three re-entry options.

The Pike River Recovery Agency, Te Kāhui Whakamana Rua Tekau mā Iwa, is focused on developing a safe plan to re-enter the mine drift, to promote accountability for this tragedy, to give the Pike River families closure and to help prevent future mining tragedies.“The expert advice we’ve received shows a safe manned re-entry and recovery of the mine drift is technically feasible and the risks of harm can be managed and minimised,” Agency Chief Executive Dave Gawn says.The Agency has produced three options for consideration which will now be developed further, including: Building a new two metre by two metre tunnel, around 200 metres long, to the Pit Bottom in Stone area; drilling a large diameter borehole; and re-entering the main drift as it is with no second means of egress (exit).“We’ve started to develop a detailed plan, with full risk assessments, hazard management plans and costings, and aim to get that back to the Minister for further consideration by the end of October,” he says.A procurement process is well underway to find contractors who will be involved in detailed planning and risk analysis, as well as mine sealing and rehabilitation works at the completion of the project.

  • Source: A Pike Reiver Recovery Agency release
Published in MINING
Tagged under
  • Business
  • news talk

Related items

  • Sir Bill English to be honoured by Victoria University of Wellington
  • Higher bank capital better for banking system and NZ
  • Plastics industry helps designers create easy-to-recycle packaging
  • Great Barrier unhappy with Auckland’s marine sludge plan
  • XE Update Friday 30 November, 2018
More in this category: « Gold mine enjoys increased trucking factors NZ Refining granted resource consents to dredge Whangarei Harbour »
back to top

Palace of the Alhambra Spain

Palace of the Alhambra, Spain

By: Charles Nathaniel Worsley (1862-1923)

From the collection of Sir Heaton Rhodes

Oil on canvas - 118cm x 162cm

Valued $12,000 - $18,000

Offers invited over $9,000

Contact:  Henry Newrick – (+64 ) 27 471 2242

Henry@HeritageArtNZ.com

 

Mount Egmont with Lake

Mount Egmont with Lake 

By: John Philemon Backhouse (1845-1908)

Oil on Sea Shell - 13cm x 14cm

Valued $2,000-$3,000

Offers invited over $1,500

Contact:  Henry Newrick – (+64 ) 27 471 2242

Henry@HeritageArtNZ.com

MSC NewsWire is a gathering place for information on the productive sector in New Zealand focusing on Manufacturing, Productive Engineering and Process Manufacturing

  • Home
  • Global Presswire
  • Industry Organisations
  • National Press Club
  • Disclaimer
  • About Us
  • Pricing
  • Sitemap
Copyright © 2025 MSC NewsWire. All Rights Reserved.
Site Built & Hosted by iSystems Limited
Top
MSCNetwork