MSC NewsWire

Founded by Max Farndale 1947 - 2018
  • Home
    • About Us
    • Pricing
    • Global Presswire
    • Industry Organisations
  • News Sectors
    • Headlines Through Today
    • Environmental Talk
    • Out of The Beehive
    • Primary Sector Talk
    • Reporters Desk
    • The MSC NewsReel
    • MSCNetwork
    • FinTech Talk
    • The FactoryFloor Newsreel
    • Trade Talk
    • News Talk
    • Industry Talk
    • Technology Talk
    • Blockchain
    • Highlighted
    • The TravelDesk
      • TravelMedia
      • Sporting Tours
      • Holidays Tours Events + More
      • Airfares
      • Travel Enquiry Form
      • TravelBits
    • Travel Updates
    • The MSC TravelDesk Newsreel
    • Travel Talk
    • Travel Time
    • The Bottom Line
    • Regional News
    • News to Run Advice Form
    • World News
    • NewsDIRECT
    • MSCVoxPops
    • Press Releases
  • National Press Club
  • Contact Us

Transpacific Hawaiki submarine cable reaches development milestone

  • font size decrease font size decrease font size increase font size increase font size
  • Print
  • Email

Hawaiki, the new subsea cable system that will link Australia, New Zealand, and islands of the south Pacific with Hawaii and the mainland United States, reached another construction milestone. The 14,000 km of undersea fiber-optic cable is in the final stages of being loaded aboard TE SubCom’s cable-laying vessels, the CS Global Sentinel and the CS Responder. Installation of the system will commence in early October 2017.

The fiber cable was manufactured at SubCom’s Newington, New Hampshire facility, along with more than 170 completed repeaters. TE SubCom also noted that horizontal directional drilling (HDD) for the cable landing in Pacific City, Oregon and Sydney, Australia has been completed. In Sydney, the construction of the land duct route is complete, the installation of the terminal equipment has started and the pulling of the land cable is scheduled to begin shortly. In New Zealand, the construction of the land duct route is complete and the construction of a new cable station is underway.

The system is on schedule for completion by mid-2018.

The carrier-neutral Hawaiki cable system was co-developed by New Zealand-based entrepreneurs Sir Eion Edgar, Malcolm Dick and Remi Galasso.

| A Converge release  ||  September 26,  2017   |||

Published in COMMUNICATION
Tagged under
  • Communications
  • technology

Related items

  • Canada: the ideal North American launchpad for your tech business
  • NZTech will launch New Zealand’s first formal digital identity organisation in Auckland on Monday.
  • Wellington supermarket trials GPS trolley tracking
  • Chorus reaches 500,000 fibre connections, price reduction for premium fibre service
  • IMAGR Ltd. of New Zealand Wins First Prize at Asian Entrepreneurship Award
More in this category: « Hawaiki picks McKay to build Northland cable landing station Nationwide test planned for Emergency Mobile Alert system »
back to top

Palace of the Alhambra Spain

Palace of the Alhambra, Spain

By: Charles Nathaniel Worsley (1862-1923)

From the collection of Sir Heaton Rhodes

Oil on canvas - 118cm x 162cm

Valued $12,000 - $18,000

Offers invited over $9,000

Contact:  Henry Newrick – (+64 ) 27 471 2242

Henry@HeritageArtNZ.com

 

Mount Egmont with Lake

Mount Egmont with Lake 

By: John Philemon Backhouse (1845-1908)

Oil on Sea Shell - 13cm x 14cm

Valued $2,000-$3,000

Offers invited over $1,500

Contact:  Henry Newrick – (+64 ) 27 471 2242

Henry@HeritageArtNZ.com

MSC NewsWire is a gathering place for information on the productive sector in New Zealand focusing on Manufacturing, Productive Engineering and Process Manufacturing

  • Home
  • Global Presswire
  • Industry Organisations
  • National Press Club
  • Disclaimer
  • About Us
  • Pricing
  • Sitemap
Copyright © 2025 MSC NewsWire. All Rights Reserved.
Site Built & Hosted by iSystems Limited
Top
MSCNetwork