MSC NewsWire

Founded by Max Farndale 1947 - 2018
Wednesday, 29 November 2023 07:45
  • Home
    • About Us
    • Pricing
    • Global Presswire
    • Industry Organisations
  • News Sectors
    • Headlines Through Today
    • Environmental Talk
    • Out of The Beehive
    • Primary Sector Talk
    • Reporters Desk
    • The MSC NewsReel
    • MSCNetwork
    • FinTech Talk
    • The FactoryFloor Newsreel
    • Trade Talk
    • News Talk
    • Industry Talk
    • Technology Talk
    • Blockchain
    • Highlighted
    • The TravelDesk
      • TravelMedia
      • Sporting Tours
      • Holidays Tours Events + More
      • Airfares
      • Travel Enquiry Form
      • TravelBits
    • Travel Updates
    • The MSC TravelDesk Newsreel
    • Travel Talk
    • Travel Time
    • The Bottom Line
    • Regional News
    • News to Run Advice Form
    • World News
    • NewsDIRECT
    • MSCVoxPops
    • Press Releases
  • National Press Club
  • Contact Us

Six-year wait for gorge route

  • font size decrease font size decrease font size increase font size increase font size
  • Print
  • Email
Six-year wait for gorge route elisa.vorster@age.co.nz

The Manawatu Gorge replacement has finally been confirmed, providing relief and certainty for a region in wait, but it will be a long six years before businesses most affected will reap the benefits.

The chosen route will reconnect the Manawatu, Tararua District, Hawke’s Bay and northern Wairarapa regions, with the new road expected to be completed by 2024.

The route runs from near the Te Apiti carpark at the western entry of the closed Manawatu Gorge, across the Ruahine Range north of the gorge, before emerging at Woodville.

People travelling between Masterton and Palmerston North have been using the Saddle Rd since the gorge closed in April last year, giving commuters the option to bypass Woodville completely.

Manager of Yummy Mummy’s Cheesecakes in Woodville, Sera Williams, called the wait “disappointing”.

“We have definitely noticed a huge difference in the amount of people coming through.

“Six years is a long time for a community which relies on people coming through it.”

New Zealand Transport Agency (NZTA) director of regional relationships Emma Speight said the Option 3 route emerged as the safest and most resilient route which best balanced the needs of the communities, businesses and road users.

“Everybody understands just how important a replacement for the gorge is.

“It will re-establish a key strategic transport and freight link that supports the needs of the people and economies of central New Zealand,” Ms Speight says.

NZTA had also committed to investigating a regional freight ring road which would include a second road bridge across the Manawatu River, which they say would help unlock regional economic development opportunities.

Tararua Mayor Tracey Collis said she was really pleased with the decision and said the announcement provided certainty for the region.

She said the inclusion of a freight ring road was a “win-win” scenario.

“Now we can really get ourselves ready for the economic benefits that will come out of it.”

Wairarapa MP Alastair Scott said the decision to go ahead with Option 3 was a good one, but a six-year wait would “continue to frustrate” the region.

“There’s going to be opportunities lost because of the disconnection between east and west.

“If that road was built tomorrow for example, you would see the likes of Woodville and Dannevirke essentially be part of a suburb of Palmerston North – there would be a lot better connectivity.

“It does seem like a bloody long time – and it’s always longer than they expect.”

Labour list MP Kieran McAnulty disagreed, saying cutting a road through a mountain range was not something that could be done quickly.

People were informed and satisfied with the time frames from the beginning.

He said the government had previously said it would “pull every lever possible” to speed this up as much as it could, and he would be continuing to have conversations to see how he could make this happen quickly.

Mrs Collis’s solution for Woodville was simple.

“We will be strong together, and get through together.”

| A Wairarapa TimesAge release  ||  March 20, 2018   |||

 

 

 

Published in REGIONAL
Tagged under
  • regional
  • mscnetwork

Related items

  • Great Barrier unhappy with Auckland’s marine sludge plan
  • Turning brain scanning on its head with smaller MRIs
  • Metal or wooden construction submissions welcomed by 21 Dec
  • NZTech will launch New Zealand’s first formal digital identity organisation in Auckland on Monday.
  • Architectural drawings declared a national heritage treasure
More in this category: « Masterton's old post office building to be developed Waste submissions to be heard in June - Napier & Hastings »
back to top
Aug 13, 2018

Whangarei leading NZ’s charge in the EV world

in TRANSPORT
Sep 25, 2018

Whakatane Native Keeps Navy Wing Flying

in News
May 24, 2018

Woolaway Construction founder, Les Nicholas was an inspiration

in CONSTRUCTION
Jul 16, 2018

On the Sunny Side of the Street

in BUSINESS
Mar 07, 2018

Phil Twyford opens EasyBuild show home village in Masterton

in CONSTRUCTION
Sep 14, 2018

Hawke’s Bay Growth Study to interview 600 local businesses

in BUSINESS
Aug 21, 2018

Aloha Hawaii Fare Alert

in TRAVEL
Nov 16, 2018

DoubleTree by Hilton Napier Hotel and Suites under construction

in TRAVEL

MSC NewsWire is a gathering place for information on the productive sector in New Zealand focusing on Manufacturing, Productive Engineering and Process Manufacturing

  • Home
  • Global Presswire
  • Industry Organisations
  • National Press Club
  • Disclaimer
  • About Us
  • Pricing
  • Sitemap
Copyright © 2023 MSC NewsWire. All Rights Reserved.
Site Built & Hosted by iSystems Limited
Top
MSCNetwork