MSC NewsWire

Founded by Max Farndale 1947 - 2018
Tuesday, 09 August 2022 04:52
  • Home
    • About Us
    • Pricing
    • Global Presswire
    • Industry Organisations
  • News Sectors
    • Headlines Through Today
    • Environmental Talk
    • Out of The Beehive
    • Primary Sector Talk
    • Reporters Desk
    • The MSC NewsReel
    • MSCNetwork
    • FinTech Talk
    • The FactoryFloor Newsreel
    • Trade Talk
    • News Talk
    • Industry Talk
    • Technology Talk
    • Blockchain
    • Highlighted
    • The TravelDesk
      • TravelMedia
      • Sporting Tours
      • Holidays Tours Events + More
      • Airfares
      • Travel Enquiry Form
      • TravelBits
    • Travel Updates
    • The MSC TravelDesk Newsreel
    • Travel Talk
    • Travel Time
    • The Bottom Line
    • Regional News
    • News to Run Advice Form
    • World News
    • NewsDIRECT
    • MSCVoxPops
    • Press Releases
  • National Press Club
  • Contact Us

Quality of checks of Chinese steel in skyscraper questioned

  • font size decrease font size decrease font size increase font size increase font size
  • Print
  • Email
  The construction site for Seascape Apartments. The construction site for Seascape Apartments. Photo: RNZ / Dan Cook

A steel quality expert is questioning whether the rules are tight enough around thousands of tonnes of Chinese steel going into the country's tallest residential skyscraper.

Seascape Apartments on Customs Street, at 52 storeys and 187 metres high, is being built by a Chinese contractor, using structural steel manufactured in China.

New Zealand's strict seismic steel standards make welding beams and frames difficult.

Australasian Certification Authority for Reinforcing and Structural Steels (ACRS) executive director Philip Sanders said problems with tainted steel supply worldwide meant his organisation was not coy about asking questions about the steel supply for the Auckland project.

It was crucial to ensure testing at every stage - of the product, the manufacturing processes, and how it was supplied.

"It really needs to be [an] independent party that sets the test plan ... for international best practice it should not be under the auspices or control of the [steel] supplier."

  • Source/ReadMore: RadioNZ release
Published in CONSTRUCTION
Tagged under
  • Steel
  • topical
  • factory floor

Related items

  • Australasian Plastics Manufacturer to Build Its First U.S. Plant
  • Trade scholarships available for 2019
  • Metal or wooden construction submissions welcomed by 21 Dec
  • FIRST Up: A Robotics Competition That Teaches Real World Engineering Skills
  • Wellington supermarket trials GPS trolley tracking
More in this category: « Wellington Airport’s terminal south extension project wins national commercial project award Auckland debut for new Farra work platform »
back to top
Apr 17, 2018

A symbolic beheading of the oil and gas industry

in ENERGY
May 21, 2018

Fiscal responsibility but can we wait for wellbeing – BERL

in BUSINESS
Nov 19, 2018

Odysseus solar-powered, ultra-long endurance, autonomous aircraft readied for maiden flight

in AVIONICS
Oct 15, 2018

Sleepwell hits another first for Samoa

in MANUFACTURING
Jun 12, 2018

KiwiRail faces future with its hand out

in LOGISTICS
Nov 08, 2018

‘Ground-breaking’ asphalt used for Queenstown Airport resealing project

in TRAVEL
May 22, 2018

'My Asthma' app update launches today to help kiwi families with asthma

in MEDICAL
Oct 18, 2018

Space startup Rocket Lab will build a second launch site in Virginia

in AVIONICS

MSC NewsWire is a gathering place for information on the productive sector in New Zealand focusing on Manufacturing, Productive Engineering and Process Manufacturing

  • Home
  • Global Presswire
  • Industry Organisations
  • National Press Club
  • Disclaimer
  • About Us
  • Pricing
  • Sitemap
Copyright © 2022 MSC NewsWire. All Rights Reserved.
Site Built & Hosted by iSystems Limited
Top
Reporters Desk