MSC NewsWire

Founded by Max Farndale 1947 - 2018
Saturday, 21 May 2022 08:15
  • Home
    • About Us
    • Pricing
    • Global Presswire
    • Industry Organisations
  • News Sectors
    • Headlines Through Today
    • Environmental Talk
    • Out of The Beehive
    • Primary Sector Talk
    • Reporters Desk
    • The MSC NewsReel
    • MSCNetwork
    • FinTech Talk
    • The FactoryFloor Newsreel
    • Trade Talk
    • News Talk
    • Industry Talk
    • Technology Talk
    • Blockchain
    • Highlighted
    • The TravelDesk
      • TravelMedia
      • Sporting Tours
      • Holidays Tours Events + More
      • Airfares
      • Travel Enquiry Form
      • TravelBits
    • Travel Updates
    • The MSC TravelDesk Newsreel
    • Travel Talk
    • Travel Time
    • The Bottom Line
    • Regional News
    • News to Run Advice Form
    • World News
    • NewsDIRECT
    • MSCVoxPops
    • Press Releases
  • National Press Club
  • Contact Us

Milestones coming up on Waikato Expressway

Tuesday, 24 April 2018 15:36
  • font size decrease font size decrease font size increase font size increase font size
  • Print
  • Email
Milestones coming up on Waikato Expressway

There is a milestone this week for the Longswamp section of the Waikato Expressway when traffic begins switching on to sections of the new lanes.  The southbound lanes are almost ready to open.

Construction started in early 2017 on widening the 5.9km section of SH1 between Rangiriri and Hampton Downs to create the new highway. The south-bound lanes are being built first, and when two-way traffic switches to the new lanes it makes room for construction of the north-bound lanes.

The NZ Transport Agency says the first staged switch over 1.4km is expected to happen on Friday, weather permitting, then another bigger section comes into use next month.

“Everyone connected with the project is looking forward to this milestone,” says NZ Transport Agency Delivery Portfolio manager, Peter Simcock.

“People using the road will see the progress and it shows the Longswamp section is on track, weather and other factors permitting, for completion next year.”

Only south-bound traffic will switch to the new lanes on Friday, south of the old Hall Road intersection with SH1, around noon. After some central median barrier work, north-bound traffic will move over the following week.

A second major switch is scheduled for a 2.5km section further north in late May. Both lanes will move at the same date, from 1km north of the old Whangamarino Rd intersection to just south of the new Paddy Rd overbridge.

“People travelling through the site since work began last year have been very patient and it’s great to start seeing this sort of progress,” Mr Simcock said.

“We now have the local road extensions open at Whangamarino and Rodda Road and they will be joined up later this year when we can open the overbridge now under construction at Paddy Road.”

The entire route remains under a 70km/h speed restriction.

Meanwhile another traffic movement is looming, on the Huntly section of the expressway.

Currently north and south-bound traffic is sharing what will be the Huntly off-ramp. Later next month traffic will move over to the future on-ramp, creating room for the project team to build the bridge over the adjacent railway line.

The 15km Huntly section is due for completion in 2020.

 

{ A NZ Transpport Agency release }   ||  April 24, 2018   |||

 

 

 

Tweet
Published in MSCNetwork
Tagged under
  • mscnetwork
  • current
  • factory floor articles
  • Transport

Related items

  • XE Update Friday 30 November, 2018
  • Turning brain scanning on its head with smaller MRIs
  • Metal or wooden construction submissions welcomed by 21 Dec
  • New plans to deliver safety improvements for three Waikato state highway projects
  • HiFX Data Update - RBNZ Financial Stability Report
More in this category: « A chippies dream building site even the roofs built on the ground A Tribute To Our Heros »
back to top
Jul 20, 2018

Einride reveals driverless all-electric logging truck

in TRANSPORT
May 10, 2018

New Zealand's Northport joins country's container sector

in PORTS
Apr 04, 2018

What resembles a giant car park in the middle of the desert in California is just one of Volkswagen's sprawling "graveyards".

in News
Apr 18, 2018

Pipeline fight ramps up at southern farm

in ENVIRONMENT
Apr 05, 2018

Winners and Losers in transport policy

in TRANSPORT
Apr 06, 2018

US-China trade spat looks set to rearrange perishables supply chains

in SUPPLY CHAIN
Nov 07, 2018

Kaikōura earthquake recovery wins prestigious global engineering award

in ENGINEERING
May 31, 2018

Robotic handling raises sawing productivity

in MANUFACTURING

MSC NewsWire is a gathering place for information on the productive sector in New Zealand focusing on Manufacturing, Productive Engineering and Process Manufacturing

  • Home
  • Global Presswire
  • Industry Organisations
  • National Press Club
  • Disclaimer
  • About Us
  • Pricing
  • Sitemap
Copyright © 2022 MSC NewsWire. All Rights Reserved.
Site Built & Hosted by iSystems Limited
Top
The FactoryFloor Newsreel