MSC NewsWire

Founded by Max Farndale 1947 - 2018
  • Home
    • About Us
    • Pricing
    • Global Presswire
    • Industry Organisations
  • News Sectors
    • Headlines Through Today
    • Environmental Talk
    • Out of The Beehive
    • Primary Sector Talk
    • Reporters Desk
    • The MSC NewsReel
    • MSCNetwork
    • FinTech Talk
    • The FactoryFloor Newsreel
    • Trade Talk
    • News Talk
    • Industry Talk
    • Technology Talk
    • Blockchain
    • Highlighted
    • The TravelDesk
      • TravelMedia
      • Sporting Tours
      • Holidays Tours Events + More
      • Airfares
      • Travel Enquiry Form
      • TravelBits
    • Travel Updates
    • The MSC TravelDesk Newsreel
    • Travel Talk
    • Travel Time
    • The Bottom Line
    • Regional News
    • News to Run Advice Form
    • World News
    • NewsDIRECT
    • MSCVoxPops
    • Press Releases
  • National Press Club
  • Contact Us

A time to reflect on the MOW Standards

Last modified on Thursday, 01 December 2016 22:22
  • font size decrease font size decrease font size increase font size increase font size
  • Print
  • Email

Were the modern earthquake-prone Wellington buildings due to relaxed Standards post- MOW?

MSCNewsWire articles published prior to 14 Nov earthquake#4 | 2 Nov 16 |   Ministry of Works Dissolution started Leaky Buildings & Earthquake Vulnerability #3 | 26 Oct 16 | Ministry of Works Wellington Motorway Swathe Sowed Anti Big Engineering Project Whirlwind#2 | 24 Oct 16 | Ministry of Works had clear cut lines of Civil Engineering Responsibility#1 | 21 Oct 16 | Department was Repository of Exceptional Engineering Technical Ability & Management

Introduce quake star ratings for buildings - engineer

Structural engineers working hard to assess and analyse damage

CentrePort owes Wellington answers about the risk of its buildings

Wellington building likely to be 'deconstructed' after earthquake damage

Freight costs tipped to rise following quakes

While you were sleeping: Wall Street weakens

Samoa's chocolate pioneers back in business

 

Published in CONSTRUCTION
Tagged under
  • Latest
  • Construction

Related items

  • No small feat: High School students build tiny houses at Ara
  • Public open day on the Huntly section of the Waikato Expressway
  • Mainzeal failed while parent made billions
  • Cannons Creek Bridge is approaching a major milestone.
  • The Macallan’s Pioneering New Distillery Installs Flowcrete Flooring
More in this category: Were the modern earthquake-prone Wellington buildings due to relaxed Standards post- MOW? »
back to top

Palace of the Alhambra Spain

Palace of the Alhambra, Spain

By: Charles Nathaniel Worsley (1862-1923)

From the collection of Sir Heaton Rhodes

Oil on canvas - 118cm x 162cm

Valued $12,000 - $18,000

Offers invited over $9,000

Contact:  Henry Newrick – (+64 ) 27 471 2242

Henry@HeritageArtNZ.com

 

Mount Egmont with Lake

Mount Egmont with Lake 

By: John Philemon Backhouse (1845-1908)

Oil on Sea Shell - 13cm x 14cm

Valued $2,000-$3,000

Offers invited over $1,500

Contact:  Henry Newrick – (+64 ) 27 471 2242

Henry@HeritageArtNZ.com

MSC NewsWire is a gathering place for information on the productive sector in New Zealand focusing on Manufacturing, Productive Engineering and Process Manufacturing

  • Home
  • Global Presswire
  • Industry Organisations
  • National Press Club
  • Disclaimer
  • About Us
  • Pricing
  • Sitemap
Copyright © 2025 MSC NewsWire. All Rights Reserved.
Site Built & Hosted by iSystems Limited
Top
The MSC NewsReel