MSC NewsWire

Founded by Max Farndale 1947 - 2018
Saturday, 13 August 2022 12:05
  • Home
    • About Us
    • Pricing
    • Global Presswire
    • Industry Organisations
  • News Sectors
    • Headlines Through Today
    • Environmental Talk
    • Out of The Beehive
    • Primary Sector Talk
    • Reporters Desk
    • The MSC NewsReel
    • MSCNetwork
    • FinTech Talk
    • The FactoryFloor Newsreel
    • Trade Talk
    • News Talk
    • Industry Talk
    • Technology Talk
    • Blockchain
    • Highlighted
    • The TravelDesk
      • TravelMedia
      • Sporting Tours
      • Holidays Tours Events + More
      • Airfares
      • Travel Enquiry Form
      • TravelBits
    • Travel Updates
    • The MSC TravelDesk Newsreel
    • Travel Talk
    • Travel Time
    • The Bottom Line
    • Regional News
    • News to Run Advice Form
    • World News
    • NewsDIRECT
    • MSCVoxPops
    • Press Releases
  • National Press Club
  • Contact Us

Pike River Recovery Agency starts risk assessments

  • font size decrease font size decrease font size increase font size increase font size
  • Print
  • Email

On 19 July 2018 the Minister Responsible for Pike River Re-Entry, Andrew Little, signed off the Agency’s baseline Concept Plan as the basis for further detailed planning and preparatory work on required equipment and infrastructure.

Work is underway on a range of options now for ventilation and access as part of the ongoing planning and preparation for the next (detailed operational) plan to go to the Minister.Three manned re-entry options for reclaiming the Pike River Mine drift are subject to a formal risk assessment process, which will be conducted in four phases. The risk assessment process marks the transition from theoretical activity to physical reality for re-entry operations into the mine drift.The four phases of risk assessment are as follows:   · Preliminary Phase: Will be conducted by PRRA staff on 8 - 9 August 2018 to confirm the step-by-step methodology for re-entry

   · Phase One is an intensive 12 day session between 10-21 September, during which the risk assessment of the three approved options will be conducted

   · Phase Two will be conducted 1 - 2 October 2018 and tasks a separate group to conduct a deliberate review of the output from Phase One.

   · Phase Three is the final review of the risk assessment. Conducted on 16 October, the aim of this review is to confirm the hierarchy of recommendations to the Minister for presentation prior to 31 October.

 

  • Source: A Pike River Recovery Agency release
Published in REGIONAL
Tagged under
  • news talk

Related items

  • Sir Bill English to be honoured by Victoria University of Wellington
  • Higher bank capital better for banking system and NZ
  • Plastics industry helps designers create easy-to-recycle packaging
  • Great Barrier unhappy with Auckland’s marine sludge plan
  • XE Update Friday 30 November, 2018
More in this category: « Partnership agreement signed with Pike River family representative Package of options needed to fund local tourism infrastructure »
back to top
Jun 06, 2018

Canterbury Chamber Concerned at Fair Pay Agreements Proposal

in BUSINESS
Oct 17, 2018

Film Industry Working Group produces tripartite recommended model

in BUSINESS
Apr 30, 2018

Winston Peters: New High Commissioner to Barbados announced

in DIPLOMATIC
Apr 11, 2018

Engineer excels at cheesemaking

in PRIMARY SECTOR
Nov 29, 2018

New communications centre improves public services

in POLITICAL
Jun 26, 2018

NZ regional economic confidence edges up in June quarter

in BUSINESS
Nov 12, 2018

Newsroom's Two Cents' Worth Business podcast

in BUSINESS
Jun 28, 2018

Greens welcome record investment in sustainable transport

in TRANSPORT

MSC NewsWire is a gathering place for information on the productive sector in New Zealand focusing on Manufacturing, Productive Engineering and Process Manufacturing

  • Home
  • Global Presswire
  • Industry Organisations
  • National Press Club
  • Disclaimer
  • About Us
  • Pricing
  • Sitemap
Copyright © 2022 MSC NewsWire. All Rights Reserved.
Site Built & Hosted by iSystems Limited
Top
The MSC TravelDesk Newsreel