MSC NewsWire

Founded by Max Farndale 1947 - 2018
  • Home
    • About Us
    • Pricing
    • Global Presswire
    • Industry Organisations
  • News Sectors
    • Headlines Through Today
    • Environmental Talk
    • Out of The Beehive
    • Primary Sector Talk
    • Reporters Desk
    • The MSC NewsReel
    • MSCNetwork
    • FinTech Talk
    • The FactoryFloor Newsreel
    • Trade Talk
    • News Talk
    • Industry Talk
    • Technology Talk
    • Blockchain
    • Highlighted
    • The TravelDesk
      • TravelMedia
      • Sporting Tours
      • Holidays Tours Events + More
      • Airfares
      • Travel Enquiry Form
      • TravelBits
    • Travel Updates
    • The MSC TravelDesk Newsreel
    • Travel Talk
    • Travel Time
    • The Bottom Line
    • Regional News
    • News to Run Advice Form
    • World News
    • NewsDIRECT
    • MSCVoxPops
    • Press Releases
  • National Press Club
  • Contact Us

On track and on time: Hawaiki undersea cable route survey completed

  • font size decrease font size decrease font size increase font size increase font size
  • Print
  • Email
On track and on time: Hawaiki undersea cable route survey completed

The route survey for the long-awaited Hawaiki cable has now been completed, and details have been revealed about how far production has progressed.

The 14,000 km cable, scheduled for completion in 2018, will link New Zealand and Australia to the United States, Hawaii and American Samoa, as well as other South Pacific islands.

The route survey included details about the kinds of small boat and shallow water work for all landings.

“The information garnered from the recently completed deep water route survey will be instrumental in ensuring the long-term viability of the cable system and we are thrilled with the progress on the cable and repeater manufacturing efforts. Installation will begin later in 2017 and a fully lit system that should positively impact the entire region is soon to follow,” says Hawaiki CEO Remi Galasso.

|  }}} Continue to read full article .  .  . 

 

 

Published in COMMUNICATION
Tagged under
  • Communications

Related items

  • Chorus reaches 500,000 fibre connections, price reduction for premium fibre service
  • Chorus’ work in rural NZ recognised on world stage
  • REANNZ goes live on new Hawaiki cable
  • New Zealand internet is going unlimited
  • NZ facing growing number of cyber incidents
More in this category: « Bewebs Speaking Email Pioneer Consulting to Provide Procurement Support for Southern Cross NEXT Cable System »
back to top

Palace of the Alhambra Spain

Palace of the Alhambra, Spain

By: Charles Nathaniel Worsley (1862-1923)

From the collection of Sir Heaton Rhodes

Oil on canvas - 118cm x 162cm

Valued $12,000 - $18,000

Offers invited over $9,000

Contact:  Henry Newrick – (+64 ) 27 471 2242

Henry@HeritageArtNZ.com

 

Mount Egmont with Lake

Mount Egmont with Lake 

By: John Philemon Backhouse (1845-1908)

Oil on Sea Shell - 13cm x 14cm

Valued $2,000-$3,000

Offers invited over $1,500

Contact:  Henry Newrick – (+64 ) 27 471 2242

Henry@HeritageArtNZ.com

MSC NewsWire is a gathering place for information on the productive sector in New Zealand focusing on Manufacturing, Productive Engineering and Process Manufacturing

  • Home
  • Global Presswire
  • Industry Organisations
  • National Press Club
  • Disclaimer
  • About Us
  • Pricing
  • Sitemap
Copyright © 2025 MSC NewsWire. All Rights Reserved.
Site Built & Hosted by iSystems Limited
Top
The MSC TravelDesk Newsreel