MSC NewsWire

Founded by Max Farndale 1947 - 2018
Tuesday, 05 July 2022 18:27
  • Home
    • About Us
    • Pricing
    • Global Presswire
    • Industry Organisations
  • News Sectors
    • Headlines Through Today
    • Environmental Talk
    • Out of The Beehive
    • Primary Sector Talk
    • Reporters Desk
    • The MSC NewsReel
    • MSCNetwork
    • FinTech Talk
    • The FactoryFloor Newsreel
    • Trade Talk
    • News Talk
    • Industry Talk
    • Technology Talk
    • Blockchain
    • Highlighted
    • The TravelDesk
      • TravelMedia
      • Sporting Tours
      • Holidays Tours Events + More
      • Airfares
      • Travel Enquiry Form
      • TravelBits
    • Travel Updates
    • The MSC TravelDesk Newsreel
    • Travel Talk
    • Travel Time
    • The Bottom Line
    • Regional News
    • News to Run Advice Form
    • World News
    • NewsDIRECT
    • MSCVoxPops
    • Press Releases
  • National Press Club
  • Contact Us

Licensed building practitioners disciplined for poor workmanship

  • font size decrease font size decrease font size increase font size increase font size
  • Print
  • Email

Nov 29, 2017  -  Two licensed building practitioners (LBPs) have been held to account by the Building Practitioners Board for serious offences relating to their performance and conduct as LBPs. Christchurch-based LBP Stefan Mortimer has been ordered to pay $1500 and had his license cancelled for what the Board described as a cavalier attitude towards Building Code compliance.

“Mr Mortimer failed to obtain building consents for two buildings he constructed on land he owned for his family to reside in. These buildings did not comply with the Building Code in terms of structural integrity, amenities or sanitation,” says Registrar LBP scheme Paul Hobbs.

“Mr Mortimer’s offences are at the serious end of the scale, and the Board noted that the dangerous and insanitary nature of the building work was an aggravating factor in this case.”

In another case, Auckland-based LBP Satish Chand has been ordered to pay $2000 and had his license cancelled. This is Mr Chand’s third appearance before the Board, and his license has previously been suspended.

Mr Chand made a number of building-related errors which demonstrated a lack of understanding and knowledge of the Building Code and applicable technical standards.

“Mr Chand’s work failed inspection 10 times, and on numerous items. Many involved serious shortcomings relating to weathertightness of the home,” says Mr Hobbs

“The Building Inspector noted the work at hand was a simple job but Mr Chand seemed to be out of his depth. Some of the work continued to fail despite remedial work attempted by Mr Chand.

“The LBP scheme requires builders to perform safe, high quality building work that follows the Building Code, including the inspection process. This requirement wasn’t met in these two cases.

“New Zealanders can have confidence that where necessary, LBPs are held to account by the Board, who ensure building practitioners meet the high standards expected of them,” says Mr Hobbs.

A guide to making a complaint about a licensed building practitioner is available on the LBP website.

| A MBIE/NZGovt.  release  || November 29, 2017   |||

 

 

Published in CONSTRUCTION
Tagged under
  • Construction
  • news talk
  • factory floor updates

Related items

  • Sir Bill English to be honoured by Victoria University of Wellington
  • Higher bank capital better for banking system and NZ
  • Plastics industry helps designers create easy-to-recycle packaging
  • Great Barrier unhappy with Auckland’s marine sludge plan
  • XE Update Friday 30 November, 2018
More in this category: « Contract awarded for Christchurch wastewater pipelines New Zealand Expansion Adds Up For Pipeline Specialist STATS Group »
back to top
Jun 08, 2018

New Housing and Urban Development Ministry

in POLITICAL
May 11, 2018

Delivery key to record $42 billion capital programme

in BUSINESS
Mar 20, 2018

NZ Steel's Pacific Steel restructuring hurt margins, says MBIE report on dumping complaint

in BUSINESS
Apr 17, 2018

Manufacturing in NZ - what does the future hold?

in MANUFACTURING
Apr 11, 2018

CADPRO Systems Ltd shared a post.

in CADPRO SYSTEMS
May 14, 2018

Triangular Bill should not proceed

in BUSINESS
May 09, 2018

Inside the new-look Westcon-Comstor in NZ

in SUPPLY CHAIN
Jun 14, 2018

ASX-listed Cimic to get lion's share of work in $750M Waikeria prison build

in BUSINESS

MSC NewsWire is a gathering place for information on the productive sector in New Zealand focusing on Manufacturing, Productive Engineering and Process Manufacturing

  • Home
  • Global Presswire
  • Industry Organisations
  • National Press Club
  • Disclaimer
  • About Us
  • Pricing
  • Sitemap
Copyright © 2022 MSC NewsWire. All Rights Reserved.
Site Built & Hosted by iSystems Limited
Top
The MSC TravelDesk Newsreel