MSC NewsWire

Founded by Max Farndale 1947 - 2018
  • Home
    • About Us
    • Pricing
    • Global Presswire
    • Industry Organisations
  • News Sectors
    • Headlines Through Today
    • Environmental Talk
    • Out of The Beehive
    • Primary Sector Talk
    • Reporters Desk
    • The MSC NewsReel
    • MSCNetwork
    • FinTech Talk
    • The FactoryFloor Newsreel
    • Trade Talk
    • News Talk
    • Industry Talk
    • Technology Talk
    • Blockchain
    • Highlighted
    • The TravelDesk
      • TravelMedia
      • Sporting Tours
      • Holidays Tours Events + More
      • Airfares
      • Travel Enquiry Form
      • TravelBits
    • Travel Updates
    • The MSC TravelDesk Newsreel
    • Travel Talk
    • Travel Time
    • The Bottom Line
    • Regional News
    • News to Run Advice Form
    • World News
    • NewsDIRECT
    • MSCVoxPops
    • Press Releases
  • National Press Club
  • Contact Us

Breakthrough for LAX – automated train on the way

  • font size decrease font size decrease font size increase font size increase font size
  • Print
  • Email
Breakthrough for LAX – automated train on the way

Los Angeles International Airport (LAX), still the prime gateway to the US for Australians, has taken a big step towards becoming “the most passenger-friendly airport in the world” in the form of the largest contract ever awarded in the history of Los Angeles.

Los Angeles City Council yesterday unanimously voted to approve a 30-year USD 4.9 billion contract with LAX Integrated Express Solutions (LINXS) to design, build, finance, operate and maintain an Automated People Mover (APM) train system at Los Angeles International Airport. The APM train should be running in five years.

“Making LAX the most passenger-friendly airport in the world means giving travellers what they need and have been asking for – reliable, convenient transportation to and from the terminals,” said Mayor Eric Garcetti.

“This historic investment will ensure that LAX is seamlessly connected with communities across the region.”

LAX, the fourth-busiest airport in the world and second busiest in the US, is generally regarded as busy rather than friendly. It’s in the middle of a project to relieve congestion for travellers.

Here’s how the APM train will look (see image/video above) and work:

The five main components are:

  • The Automated People Mover (APM) just approved – a 3.6 km electric train system comprised of six stations that will connect travellers to the regional rail system, rental car facility and other drop-off/pick-up locations. See clip above.
  • Intermodal Transportation Facility (ITF- West) – a facility for airport parking and passenger drop-offs and pick-ups from personal vehicles, buses, shuttles, taxis, and ride-sharing services.
  • Consolidated Rent-A-Car (ConRAC) – a facility that will house 23 rental car locations in one area with easy access to the 405 and 105 Freeways.
  • Roadway Improvements – designed to alleviate traffic congestion in and around the airport.

Construction of the APM train, ConRAC, ITF and part of the roadway improvements will start in 2018 and become operational in 2023. The remaining roadway improvements are anticipated to start in 2023 and be completed by 2035.

 

| A Global Travel Media release written by Peter Needham  |  ||  April 13, 2018   |||

 

 

 

Published in TRAVEL
Tagged under
  • traveltalk
  • the msctraveldesk newsreel
  • the msc newsreel
  • Travel

Related items

  • Exploring Alaska's Coastal Wilderness
  • Air New Zealand - Economy Skycouch™ for $1* when you book two Economy seats
  • Australasian Plastics Manufacturer to Build Its First U.S. Plant
  • Canada: the ideal North American launchpad for your tech business
  • Trade scholarships available for 2019
More in this category: « New Monet exhibition in London explores the use of buildings in his work Cathy Pacific Specials For Christmas »
back to top

Palace of the Alhambra Spain

Palace of the Alhambra, Spain

By: Charles Nathaniel Worsley (1862-1923)

From the collection of Sir Heaton Rhodes

Oil on canvas - 118cm x 162cm

Valued $12,000 - $18,000

Offers invited over $9,000

Contact:  Henry Newrick – (+64 ) 27 471 2242

Henry@HeritageArtNZ.com

 

Mount Egmont with Lake

Mount Egmont with Lake 

By: John Philemon Backhouse (1845-1908)

Oil on Sea Shell - 13cm x 14cm

Valued $2,000-$3,000

Offers invited over $1,500

Contact:  Henry Newrick – (+64 ) 27 471 2242

Henry@HeritageArtNZ.com

MSC NewsWire is a gathering place for information on the productive sector in New Zealand focusing on Manufacturing, Productive Engineering and Process Manufacturing

  • Home
  • Global Presswire
  • Industry Organisations
  • National Press Club
  • Disclaimer
  • About Us
  • Pricing
  • Sitemap
Copyright © 2025 MSC NewsWire. All Rights Reserved.
Site Built & Hosted by iSystems Limited
Top
page2